|
Product Details:
|
Brand Name: | Baisha | Place Of Origin: | China |
---|---|---|---|
Application: | For Artificial Leather | H.S. Code: | 3812309 |
Purity: | 99.5% | Grade Industrail Grade: | Industrail Grade |
Color: | Slightly Red Clear Liquid | Name: | Barium-Zinc Heat Stabilizer For PVC |
High Light: | Clear Barium Zinc Stabilizer,3812309 Barium Zinc Stabilizer |
Excellent Thermal Stability Barium Zinc Stabilizer For Artificial Leather
The clear liquid Barium Zinc stabilizer BS-103a is a general PVC stabilizer developed by Baisha for the top layer of artificial leather. This composite Barium Zinc stabilizer does not contain heavy metals, lead-free and non-toxic, It has high thermal stability, and excellent processing performance, low precipitation, and high processing conversion rate. It can be used to make leather by calendering and coating lines.
Technical Data Sheet
.
Property | Unit | Method | Specification |
Appearance | Visual | Slightly Red Clear Liquid | |
Main Products | %wt | ≥99.5 | |
Barium Content | %wt | 1 – 3 | |
Zinc Content | %wt | 1 - 3 | |
Moisture Content | %wt | ASTM E1064-92 | ≤0.5 |
Characteristics
1. Good initial coloring and long-term thermal stability
2. Good lubricity, can be used separately, excellent processing ability
3.Excellent initial color, excellent indoor air quality (low VOCs)
4.Outstanding early color hold and excellent transparency.
5. Resistance of sulfide pollution good, good weather resistance, no sulfur pollution
6.Cost effective
Applications
For the top layer of leather colored films
Package
200 Kg/Drum
Suggested Dosage
2 – 3 PHR
Storage
Store in the well-closed original package at room temperature (<35℃), in a cold and dry environment, protected from light, heat, and humidity sources.
Quality assurance
In order to ensure product quality as the fundamental, Baisha is known for its stable product quality, actively implements ISO9000 quality system management standards, and sets up quality control links throughout the process.
We have a QC person stay on the production lines due to the inspection. All products must have been inspected before delivery. we do an inline inspection and final inspection.
1.All raw material checked once it arrives at our factory.
2.All pieces and logo and all details checked during production.
3.All packing details checked during production.
4.All production quality and packing checked on final inspection after finished.
5.We have a strict quality system in order to ensure the quality of products.
Contact Person: Jim
Tel: +8613660455413